LOAD TESTING WITH RESISTIVE LOAD BANKS

Conducting a load test after the generator installation is an essential part when handing over the system to client.

Shipping, installation and installation design (to generators include paralleling of emergency) can provide un-planned issues. To prevent loss of time because loss of utility power, scheduled load testing of backup generators is recommended.

UTE Engineering is capable of testing 100 kVA to 3000 kVA Generators to relevant ISO standards (including paralleled generator systems) using load banks. Load testing with charted engineer certification can also be provided.